Projects (as Main Contractor)


New Built Works Construction:

Residential Building, No. 4 Kent Road, Kowloon Tong

Residential Building, No. 147 Waterloo Road, Kowloon Tong

Composite Development at No.245-247,Tai Kok Tsui Road, Kowloon

Commercial Building, 40 Kimberley Road, Tsim Sha Tsui

Residential Building Works, 11 Sha Tin Ridge Road, Sha Tin

Seng Tak Central School Building Project, New Clear Water Road, Kowloon

Commercial Development 24A &24B Granville Road, Tsim Sha Tsui
No.8-12,
Yuen Long Pau Cheung Square, Yuen Long

Composite Building On K.I.L 11238 At Nos 445-447 Shangshui street, Kowloon

E&M Works Construction:

Sha Tin Fo Tan Data Center Project


Redecoration Work

Kau To Shan and Hong Lok Yuen South Bay, Shouson Hill, Mount Kellett and other luxury residential decoration.


和明以主(zhǔ)承建商的(de)身份完成了
:

1.尖沙咀金巴利道40號商業大廈(shà)建築(zhù)工(gōng)程(整單所有(yǒu)項目)

2.香港觀塘新清水灣(wān)道(dào)重置香港扶幼會盛(shèng)德中心學校建築工程(整單所有(yǒu)項目)

3.香港沙田嶺道(dào)11號(hào)住(zhù)宅建築工程

4.沙田火炭數據中心(xīn)工程(機電設備連裝(zhuāng)修)

5.九肚山(shān)以及康(kāng)樂園(yuán)南灣、壽臣山、加列等(děng)豪宅(zhái)裝修(xiū)等

6.大角咀(zuǐ)道245-247號住宅大樓建築工程(整單所有項目)

7.九龍塘根德道4號單幢式住宅

8.九龍塘窩(wō)打老道147號單幢式住宅

9.尖沙咀加連威老道24A&24B大廈

10.元朗(lǎng)炮仗坊 8-12

11.旺角上海(hǎi)街445號住宅大

12. 屯(tún)門環保(bǎo)園(yuán)廢紙回收廠房及其他(tā)相關的發展項目之P1地(dì)段

Projects (as Sub Contractor)


Civil Engineering:

Hong Kong's Siu Sai Wan Park Drainage Project,

Government Development Department's Tin Shui Wai Wooden Bridge Project,

Tung Chung Road Extension Project, and other steel structures, pavements, channel works, concrete structures and drainage works.

Hong Kong Siu Sai Wan Park Steel Structure Project, Stainless Steel Project,

Phase III Reclamation 2009/19 project of the steel railing project, airport railway depot steel structure.


A&A Works Construction:

The renovation project of Sha Tin Railway Station including steel structure engineering and   reinforced concrete structure works.


Steel Structure Engineering

Shanghai Lu Pu Bridge Steel Structure Engineering.


Design and manufacture of installation works:

Mobile safety fence in the Wan Chai - Central Phase II reclamation works.



Other projects completed by the Company include:

Shatin Vista Paradiso external area ; site wooden & steel decoration work



土狂野欧美激情性XXXX在线观看,韩日午夜在线资源一区二区,漂亮大学生韩国三级播放国产,啊轻点灬大ji巴太粗太长了啊程

1.香港小(xiǎo)西灣公園渠(qú)務工程A
2.政府(fǔ)拓展署天水(shuǐ)圍木橋工(gōng)程
3.東涌路擴建工程中7公里的擋土墻工程
4.第三期填海2009/19的高速工程的防撞欄工程(chéng)
5.機(jī)場鐵路油庫鋼結構,鋼結構、路面、渠道工程、混(hùn)凝土結構以(yǐ)及渠(qú)務工程
6.香(xiāng)港小(xiǎo)西(xī)灣海濱公園(yuán)鋼結構工程、不(bù)銹鋼工程
7.加建(jiàn)、建(jiàn)工(gōng)程:沙田(tián)火車站(zhàn)的改造工程(chéng)包括(kuò)鋼(gāng)結構工程、鋼筋混凝結構工程(chéng)
8.鋼結(jié)構(gòu)工程:上海盧浦大橋鋼結構工程(chéng)
9.設計與制造安裝(zhuāng)工程-灣仔至中環第二期填海工程中的移動式安全圍欄的設(shè)計、制造工程

其他工程

沙田聽濤雅苑外欄&裝飾工程(chéng)(木器鐵器(qì))